Downer’s Auckland water renewals programme involves installing new water mains across the region, often within tight urban corridors where traffic flow, pedestrian safety, and local access must be maintained. Traffix provided both TMP design and on-site traffic management to help crews safely access underground infrastructure while keeping disruption controlled across residential and commercial areas.
Traffix was engaged early to support the design stage, enabling coordination between impacted parties and clearer decisions around staging and controls before work programmes were locked in. This approach helped create a safe working space for crews while managing the practical realities of traffic flow and pedestrian movements in busy urban streets.
Dedicated STMS staff were assigned to these projects, supporting continuity across delivery. With consistent personnel and clear communication between field teams and management, temporary layout changes and site transitions were managed smoothly, helping to avoid delays and maintain critical timeframes across multiple sites operating simultaneously.
Traffix supported the safe, efficient delivery of water main renewals across Auckland, with risk based, site specific planning that adapts to changing conditions on the ground. Over the past year, more than 6 kilometres of water main replacements were delivered using Traffix’s approach, supporting safe outcomes for crews, road users, and local communities.
In a desperate time of need, Traffix stepped up to the plate and has continually delivered safe and efficient traffic management for our watermain renewal projects. With TMD’s being drafted in hours, and seeking AT’s approvals with great rapport and quick turnaround times, it gives us confidence that Traffix understands our onsite requirements. In the past year, we have safely delivered over 6km of watermain replacements using Traffix’s risk-based approach, site-specific designs.