Auckland Water Renewals

Project Overview

Downer’s Auckland water renewals programme involves installing new water mains across the region, often within tight urban corridors where traffic flow, pedestrian safety, and local access must be maintained. Traffix provided both TMP design and on-site traffic management to help crews safely access underground infrastructure while keeping disruption controlled across residential and commercial areas.

Project Details

Client
Downer - Energy & Utilities
Location
Auckland wide
Industry
Utilities
Timeframe
On average, each project takes around 3 months to deliver, with several projects often running in parallel.

Scope of Work

  • Design and submission of risk-based Traffic Management Plans
  • On-site traffic control
  • Temporary traffic layout adjustments
  • Consultation and on-site auditing

Key Challenges

  • Live traffic and pedestrian volumes in public-facing environments
  • Restricted road widths and constrained work zones
  • Maintaining access for residents and surrounding businesses
  • Night works required where disruption needed to be minimised
  • Managing residential impacts over multi-week delivery periods

Our Approach

Traffix was engaged early to support the design stage, enabling coordination between impacted parties and clearer decisions around staging and controls before work programmes were locked in. This approach helped create a safe working space for crews while managing the practical realities of traffic flow and pedestrian movements in busy urban streets.

Dedicated STMS staff were assigned to these projects, supporting continuity across delivery. With consistent personnel and clear communication between field teams and management, temporary layout changes and site transitions were managed smoothly, helping to avoid delays and maintain critical timeframes across multiple sites operating simultaneously.

The Outcome

Traffix supported the safe, efficient delivery of water main renewals across Auckland, with risk based, site specific planning that adapts to changing conditions on the ground. Over the past year, more than 6 kilometres of water main replacements were delivered using Traffix’s approach, supporting safe outcomes for crews, road users, and local communities.

In a desperate time of need, Traffix stepped up to the plate and has continually delivered safe and efficient traffic management for our watermain renewal projects. With TMD’s being drafted in hours, and seeking AT’s approvals with great rapport and quick turnaround times, it gives us confidence that Traffix understands our onsite requirements. In the past year, we have safely delivered over 6km of watermain replacements using Traffix’s risk-based approach, site-specific designs.

Vincent Freeth
Project Manager
Downer - Energy and Utilities

Let's chat

If you are planning water or services works in live road corridors, we can help shape the traffic management approach early, reduce disruption for residents and road users, and keep approvals and delivery running smoothly from stage to stage.